Endress + Hauser Flowtec
Greenwood, IN




1/5
- 89,700 SF Manufacturing Facility
- Project Included a basement with two (2) field built concrete 50,000 gallon holding tanks used for flowmeter calibration
- Project Included three (3) 5-ton and one (1) 7.5-ton bridge cranes spanning the entire facility
- Project included a 400 ft. 7’x7’ drainage culvert installed beneath the building to mitigate a legal drain and regain the usable land
- 14,000 SF Class A Office, Pond Loop Geothermal, and an Online Universal Building Automation system
- Loading Dock and in-slab Radiant Heat Sidewalks
- LEED Certified
- Genesis Property Development managed the design and construction of the Endress Hauser Flowtec Project. The project started in 2011 and was complete in 2013.